top of page
Logout
Login
Home
CARE
Autodesk Forma Resources
Autodesk Access Request
Common Office Tasks
Follow These Steps – RFIs
Work Orders & Schedule of Values (SOV)
T&M (Time & Materials)
Upload Submittals
Responding to RFQs in Autodesk Build
Supplements (Change Orders)
Change Requests
Okland Billing Cycle
Bridge
Submitting an Application for Payment (AFP) in GCPay
Schedule
Follow These Steps – RFIs
Work Orders & Schedule of Values (SOV)
T&M (Time & Materials)
Upload Submittals
Responding to RFQs in Autodesk Build
Supplements (Change Orders)
Change Requests
Okland Billing Cycle
Bridge
Submitting an Application for Payment (AFP) in GCPay
Schedule
Common Field Tasks
T&M (Time & Materials)
Finding Activities in the Schedule
Access the Latest Drawings
Finding Items in Your Court
Safety Hazard & Safety Incident
QC Inspections
Creating and Closing Issues
Daily Logs
Sheets
Roadblocks
Schedule
T&M (Time & Materials)
Finding Activities in the Schedule
Access the Latest Drawings
Finding Items in Your Court
Safety Hazard & Safety Incident
QC Inspections
Creating and Closing Issues
Daily Logs
Sheets
Roadblocks
Schedule
Okland's Forma Documentation
Project Home
Sheets
Mobile Device
Files
Specifications
Issues
Forms
Photos
Bridge
RFIs
Submittals
Meetings
Correspondence
Schedule
Members
Reports
Project Home
Sheets
Mobile Device
Files
Specifications
Issues
Forms
Photos
Bridge
RFIs
Submittals
Meetings
Correspondence
Schedule
Members
Reports
Menu
Close
6.0 STORED ENERGY/ELECTROCUTION CONTROLS
Are these controls in place?
6.1 PPE REQUIRED FOR ENERGIZED EQUIPMENT
PPE required that meets shock and arc flash protection requirements when working on or around energized equipment
6.2 PIPES/LINES HAVE BEEN PURGED
Pipes and lines have been purged as appropriate
6.3 BRACING FOR POTENTIAL ENERGY
Bracing to control gravity (potential energy) has been installed as appropriate
6.4 ENERGY BLED OFF
Energy has been safely released (bled off) as appropriate
6.5 ELECTRICITY DISCONNECTED
Electricity has been isolated, disconnected, etc. as appropriate
6.6 LOCK OUT PROCESS
Lock out process and procedure carried out properly (e.g. application of locks, group lockout box, etc.)
6.7 COVERS ARE INSTALLED
Covers are installed on live panels, receptacles, and switches
6.8 CORDED EQUIPMENT PROCTECTED BY GFCIS
Corded electrical equipment protected by GFCIs
6.9 EXTENSION CORDS ARE OFF THE GROUND
Extension cords are off the ground (or to side of walkway) not creating trip hazards at any walkway or pathway
6.10 EXTENSION CORDS ARE IN GOOD CONDITION
Extension cords are in good condition (e.g. ground pin in place, no nicks/cuts in insulation)
6.11 EXTENSION CORDS ARE NOT SUBMERGED IN WATER
Extension cords are not submerged in water
6. STORED ENERGY ELECTROCUTION
Logout
Login
Home
CARE
Autodesk Forma Resources
Autodesk Access Request
Common Office Tasks
Follow These Steps – RFIs
Work Orders & Schedule of Values (SOV)
T&M (Time & Materials)
Upload Submittals
Responding to RFQs in Autodesk Build
Supplements (Change Orders)
Change Requests
Okland Billing Cycle
Bridge
Submitting an Application for Payment (AFP) in GCPay
Schedule
Common Field Tasks
T&M (Time & Materials)
Finding Activities in the Schedule
Access the Latest Drawings
Finding Items in Your Court
Safety Hazard & Safety Incident
QC Inspections
Creating and Closing Issues
Daily Logs
Sheets
Roadblocks
Schedule
Okland's Forma Documentation
Project Home
Sheets
Mobile Device
Files
Specifications
Issues
Forms
Photos
Bridge
RFIs
Submittals
Meetings
Correspondence
Schedule
Members
Reports
Media Center
Careers
Contact
bottom of page